Services
A single source for every phase of the build
From the first site walk to the last punch-list item, Caladesi plans, designs, manages and builds under one roof. Here is everything we do, grouped the way a project actually unfolds.
01 · Phase
Pre-Construction
Getting the scope, budget and schedule right before anyone breaks ground.
- Design team & system evaluation
- Engineering design services
- Master planning
- Design/build construction
- Hybrid building system designs
- Metal building system designs
- Budgeting and estimating
- Schedule development
- Alternative cost solutions
- Design & budget control oversight
02 · Phase
Construction
Building it, managing it and keeping it on schedule, safely.
- Design services
- Design/build construction
- General contracting
- Construction management
- Project management
- Permitting coordination
- Regulatory entity coordination
- Schedule control
- OSHA-certified crews
- Job-specific safety programs
- Quality control
- Self-performed work
03 · Phase
Site Construction
Civil and site work, from raw land to a finished pad and parking lot.
- Civil engineering
- Complete site development
- Site & utility development
- Storm drainage development
- Maintenance of traffic
- Concrete sidewalks and slabs
- Existing site work improvements
- Truck well installations
04 · Phase
Renovations & Specialty Work
Improving the buildings you already own, inside and out.
- Building renovations
- Restroom renovations
- Existing metal building repairs
- Reroofing solutions
- Interior mezzanine additions
- Steel fabrications
- Cabinetry fabrication & modifications
- Energy savings retrofitting
- Green daylighting retrofitting
- Concrete & masonry cutting and removal
Metal Re-Roofing
A new roof over the one you have, with the business still open
Most metal buildings do not need a tear-off. As an Authorized Butler Builder since 1968, Caladesi installs Butler retrofit roof systems over an existing metal, built-up or low-slope roof: new sub-framing, new insulation, and a Butler MR-24 standing-seam roof on top. Crews work from the roof, the doors stay open below, and the building comes out drier, tighter and better insulated.
Butler retrofit systems are tested for UL wind uplift, impact and air and water infiltration, with FM Global and U.S. Army Corps of Engineers approvals.
Option 01
Retrofit
Best when the structure is sound and the roof is the problem: leaks, rust, failed fasteners, poor insulation, or a flat roof that ponds.
- No tear-off, no landfill run
- Business keeps operating underneath
- Adds insulation, up to R-38 in a high-profile system
- Re-establishes slope on flat or low-slope roofs
- Concealed clips let the new panels expand and contract
- Typically the faster and lower-cost path
Option 02
Replace
Best when the deck, purlins or frame are compromised, the roof has been re-covered before, or the building is being reconfigured anyway.
- Existing roof and damaged framing removed
- Structure inspected and repaired while it is open
- Full-depth insulation and vapor control redesigned
- New MR-24 standing-seam roof on new purlins
- Opportunity to add daylighting, roof curbs and equipment
- Longer schedule and temporary weather protection required
One team, start to finish
Because planning, design, management and construction sit in the same office, there is no hand-off where details get lost. We self-perform much of the work, coordinate the rest with long-standing trade partners, and have been an Authorized Butler Builder® since 1968. Licensed Florida general contractor CGC 058861.
Start the conversation
Not sure which service you need?
Tell us about the project and we will map out the phases, the budget and the schedule with you.
Start your projectQuestions first? See the FAQ, or call (727) 585-9945
